<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=294581992215478&amp;ev=PageView&amp;noscript=1">

CASE STUDY #416

Multi Purpose Facility for North Stirling Downs

Multi Purpose Facility for North Stirling Downs

14th June 2019 Case Study # 416
PROJECT VALUE: $175 - 200K
PROJECT BUILD TIME: 8 WEEKS

CLIENT BRIEF

The client required a facility for storage of hay and grain, as well as the ability to store various pieces of farm machinery in the off season..

CHALLENGES

AUSPAN SOLUTIONS

FEATURES

  • 60 x 21m floor area
  • 2.4m grain walls. (Integrated engineering design to suit)
  • Large access door on each end to allow drive through machinery access
  • Integration with existing weigh bridge, bucket elevator & silo system
  • Roof safe system providing easy access for maintenance. 

CLIENT TESTIMONIAL

AUSPANS TESTIMONIAL

What Are you waiting for?

Your Building Project Simplified.
On Time & Delivered Right.
Created Uniquely for YOU.

image-Jan-11-2021-05-08-08-17-AM (1)-1
NEVILLE WALL
AGRICULTURAL SHED SALES