<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=294581992215478&amp;ev=PageView&amp;noscript=1">

CASE STUDY #911

Heavy Fabrication Workshop For Shermac

Heavy Fabrication Workshop For Shermac

12 JULY 2024 Case Study # 991
PROJECT VALUE: $600K - $650K
PROJECT BUILD TIME: 18 DAYS ON SITE, 9 WEEKS TOTAL

CLIENT BRIEF

Shermac is an engineering firm that focuses on providing high quality, engineered for purpose mobile equipment to the mining, civil and commercial sectors Australia-wide.

CHALLENGES

AUSPAN SOLUTIONS

FEATURES

  • Hook height of 2 x 25T gantry cranes running bumper to bumper. 
  • Double track industrial sliding doors with manual locking system. 
  • 10m cantilever canopy to full shed length above sliding doors. 

CLIENT TESTIMONIAL

AUSPAN TESTIMONIAL

What Are you waiting for?

Your Shed Construction Simplified,
Delivered On Time, and Created Uniquely for Your Needs.

image (1)-1
RUSSEL MILLER COMMERCIAL BUILDING MANAGER