<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=294581992215478&amp;ev=PageView&amp;noscript=1">

CASE STUDY #296

Himac Attachments Workshop in Albany, WA

Himac Attachments Workshop in Albany, WA

02 MAY 2017 Case Study # 296
PROJECT VALUE: $100k-$250k
PROJECT BUILD TIME: 8 WEEKS

CLIENT BRIEF

Himac Attachments expanding operations nationally required additional workshop space to keep up with the demand. AUSPAN was selected to design and construct the complete facility next door to the original Himac workshop/showroom.

CHALLENGES

AUSPAN SOLUTIONS

FEATURES

  • Removed columns to allow large clear span entry doorways.
  • Mono rail cranes to suit workshop requirements.
  • Mezzanine floor structure for second level storage and lunchroom facilities.
  • Feature canopy and branded facade to road frontage.
  • Custom stormwater system delivering all stormwater to one end of building.

CLIENT TESTIMONIAL

AUSPANS TESTIMONIAL

What Are you waiting for?

Your Shed Construction Simplified,
Delivered On Time, and Created Uniquely for Your Needs.

image (1)-1
RUSSEL MILLER COMMERCIAL BUILDING MANAGER