CASE STUDY #108

New Bus Depot in Cockburn, WA, for ATG

New Bus Depot in Cockburn, WA, for ATG

04 NOVEMBER 2014 Case Study # 108
PROJECT VALUE: $250k-$500k
PROJECT BUILD TIME: 8 WEEKS

CLIENT BRIEF

Ben Doolan of ATG (Australian Transit Group) engaged Auspan from the initial design of his new bus depot facility which is now the base for moving up to 25,000 passengers throughout WA in a single day.

CHALLENGES

AUSPAN SOLUTIONS

FEATURES

  • Six complete drive through maintenance bays
  • Tilt panel office with suspended slab second story
  • Architectural awning/shades to front office area
  • Roof cover to bus wash facility
  • Mezzanine storage area

CLIENT TESTIMONIAL

AUSPANS TESTIMONIAL