PROJECT VALUE: $4.5M
PROJECT BUILD TIME: 12 MONTHS

CLIENT BRIEF

Nexus Recycling is Western Australia’s only used lead acid battery recycling plant and has only commenced operations in 2022. A new building was required that would allow the firm to extract approximately 97% of lead acid battery materials including acid, plastics and metallic lead. The maximum processing capacity of the plant is 43 MT per annum.

CHALLENGES

AUSPAN SOLUTIONS

FEATURES

  • Extensive internal civils including concrete plinths, bunded areas, and lead containment.

  • Unique fire prevention features that are relevant to a battery recycling plant.

  • Retaining walls that allow the building to get right up to the boundary.

CLIENT TESTIMONIAL