CASE STUDY #68

PTA Bus Depot Facility

PTA Bus Depot Facility

03 JUNE 2014 Case Study # 68
PROJECT VALUE: $250-$500K
PROJECT BUILD TIME: 8 WEEKS

CLIENT BRIEF

Robinson Buildtech utilised AUSPAN’s Design & Construct capabilities to assist their tender submission for a project which involved the Design and Construction of a Bus Depot for the PTA.

CHALLENGES

AUSPAN SOLUTIONS

FEATURES

  • 2T Mono Rail crane incorporated into shed design
  • The office roof structure and wash bay were incorporated as part of the shed
  • Translucent division wall supplied & installed by AUSPAN which offered protection from the weather while still allowing natural lighting in.
  • Bin store designed and constructed by AUSPAN
  • Electric roller shutter doors

CLIENT TESTIMONIAL

AUSPANS TESTIMONIAL

AUSPANS TESTIMONIAL